INDOT announced that paving operations will begin Monday on State Road 933 in South Bend. Crews will start Monday on the section between Angela Boulevard and Douglas Road, beginning with right lanes both northbound and southbound. Tuesday, work will be on the left lanes in both directions and Wednesday crews will pave the center turn lane. Following that section, the operation will move north with paving to be done in the same format between Douglas Road and Cleveland Road. Following that, crews will pave the area between Darden Road and Auten Road. These three sections are anticipated to fully wrap up within two weeks. Throughout these operations, traffic will be maintained a minimum of one lane in each direction at all times. The sections between Cleveland Road and Darden Road and from Auten Road to the Michigan state line will follow. Additional information will be released prior to those last two sections getting underway.