Indiana Department of Transportation contractor Rieth Riley Construction will reduce State Road 2 to one lane between Colorado St and Clay St on or after Monday, April 29.
State Road 2 will be reduced to one lane at Pearle Creek, with traffic controlled by temporary traffic signals through early July. Crews will be conducting a bridge deck overlay preventative maintenance project.
INDOT urges drivers to stay alert near crews and be prepared to wait for the temporary traffic signal. Motorists are encouraged to allow extra time when driving through this area and should slow down and drive distraction-free through all work zones.